Cyklostezka Bečva - The Becva Cycle Trail

1. Hranice – Rybáře- Slavíč –Týn nad Bečvou

The first stage which was implemented in 2005 delivered 2,163m of the cycleway, while the other 1,955m were delivered in the second stage in 2009, and finally, in the third stage in 2015 the last 1,700m leading from the Drín settlement to the boarder od the Hranicko cadastre and continuing as a shared path for cyclists and pedestrians with a total length of 1,300m. This section was built with a total cost of CZK 5.9 mill., incl. a support from the EU funds.



2. Týn nad Bečvou – Lipník nad Bečvou (non-urban area)

Then, there is a newly built shared path for cyclists and pedestrians which was built with a support from EU pre-structural funds in 2001 and is 1,300m long.



3. Lipník nad Bečvou – Osek nad Bečvou

This is a road with a ban to motor traffic, and it is 3,400m long. The road was built as a part of the 1997 flood damage elimination.



4. Osek nad Bečvou – Grymov, crossroads (non-urban area)

This is a road with a ban to motor traffic and it is 2,400m long. The road was built as a part of the land consolidation, therefore it has a sign B11.



5. Grymov, a bridge – Přerov, the Palacký Bridge (approx. 7 km)

  • The cycleway was marked in 2010